A 压铸 factory audit is a weighted evidence review, not a walkthrough. Eight dimensions decide whether a plant can hold your drawing for three years: process capability, tooling and die maintenance, melt chemistry, in-process inspection, metrology, documentation, production control, and subcontracting. Each is scored 0-5 against evidence you can photograph, weighted to 100, and compared with a pass line agreed before the visit. A plant that scores well on machines and badly on die records will pass its first article and fail its second year.
关键要点
- A 压铸 factory audit scores eight weighted dimensions to 100, with a minimum per dimension so one strong area cannot hide a weak one.
- Machine tonnage proves capacity; shot counters, die maintenance logs and repair records prove tooling control.
- Ask for the spectrometer printout per heat, not a certificate, and check the Si and Cu window against the grade.
- X-ray film retention, CMM calibration certificates and gauge R&R studies are the three fastest credibility tests.
- A plant that cannot show lot traceability in ten minutes will not reconstruct it during a recall.
- Set the pass line before the visit, or the scoring drifts toward whoever hosted the better lunch.
What the Audit Has to Prove in One Day
Most factory visits fail for a structural reason: the buyer arrives with a checklist, walks the floor for three hours, and leaves with impressions. An impression cannot be compared with the next plant or with the same plant next year. A scoring matrix fixes that by converting observation into a number with a stated evidence rule, and by forcing the auditor to write down what was seen rather than how it felt.
The time budget matters as much as the score sheet. A one-day audit of a die casting plant should spend roughly 30 minutes on the opening document review, 90 minutes on the shop floor, and 60 minutes on quality and metrology. Tooling and die storage take another 45 minutes, and the remainder goes to closing questions and score consolidation. If the itinerary is all floor and no records, the visit cannot produce a score above 3 on any documentation dimension, because nothing was verified.

Define the scope before the visit. An audit for a single housing program does not need to grade the whole plant; it needs to grade the cells, the die set and the inspectors that will touch that part. Narrow scope raises the value of each question, because a sample of three dies examined closely beats a tour of forty machines. Broad supplier qualification and program-specific approval are different audits, and they should produce different score sheets.
The evidence rule
Every score above 3 requires a document or a physical artifact, not an answer. “We do that” is a 2. A signed record from last month is a 4. A record with a named owner, a revision number and a trend is a 5. Write the artifact into the audit note beside the score, because the note is what survives after the visit and the photograph is what settles the argument six months later.
The Scoring Matrix
The matrix below is the working template. Weights reflect how often each dimension causes program failure in die casting, not how easy it is to inspect. A 压铸 factory audit that weights machine tonnage above die maintenance will approve the wrong plant. The pass line sets the minimum acceptable score for that dimension, and the overall threshold of 70 out of 100 is applied only after every dimension clears its own floor.
| Dimension (weight) | 0-1: fail | 3: partial | 5: evidence | Pass line |
|---|---|---|---|---|
| Process capability and machine fit (15) | No tonnage record; largest machine unexplained; no shot parameter sheets | Tonnage list exists; parameters held per die but not per revision | Parameter sheet per die and revision, locked in the controller, with a change log | 4 |
| Tooling and die maintenance (15) | No shot counter; dies stored on the floor; no repair history | Shot counters exist; maintenance log incomplete or unsigned | Shot count per die, maintenance every 10,000-20,000 shots, weld repair records, racked storage | 4 |
| Melt and chemistry control (15) | No spectrometer on site; certificates only from the ingot supplier | Spectrometer present; sampling frequency unstated | Spectro printout per heat, retained, with the grade window posted at the furnace | 4 |
| In-process inspection (15) | Visual only; no sampling plan; no leak or X-ray capability | Sampling plan exists but undocumented results | Written sampling rate per characteristic, X-ray judged to ASTM E505, leak test with recorded decay | 3 |
| Metrology and calibration (10) | Calibration expired; no CMM or no program library | Calibration current; CMM programs built from the die | Calibration certificates, gauge R&R under 10%, CMM programs from drawing datums | 3 |
| Documentation and traceability (10) | No lot traceability; reports recreated on request | Traceability exists but takes a day to retrieve | Heat lot to part lot in under ten minutes, FAI and PPAP files retrievable by part number | 4 |
| Production control and capacity (10) | No schedule; overtime used as the plan | Schedule exists; capacity stated without basis | Load against tonnage hours, OEE or cycle data, stated capacity with assumptions | 3 |
| Subcontracting control (5) | Finishing and heat treatment outsourced with no audit trail | Approved subcontractor list without evidence | Named subcontractors, approval records, incoming inspection on returned lots | 3 |
| Safety, housekeeping, environment (5) | Blocked aisles, unlabeled chemicals, no PPE | Basic order; some storage issues | Marked walkways, segregated die storage, waste segregation, visible safety board | 3 |
Score each row out of 5, multiply by the weight, and divide the total by 5 to land on a figure out of 100. A dimension at 2 or below fails its pass line even if the total clears 70, and the audit result is “conditional” rather than “approved”. That rule exists because the failure modes are not interchangeable. A plant with excellent metrology and no die maintenance produces a perfect first article from a die that will crack at 60,000 shots.
Two disciplines keep the matrix honest. Score during the visit, not after, and write the artifact next to the number. Then photograph the artifact. A die maintenance board, an X-ray film log and a calibration sticker with a date are all one frame, and the frame is the difference between a finding and an opinion.
Machine, Die and Maintenance Evidence
The machine hall is the easiest area to be impressed by and the easiest to misread. Tonnage plates tell you what the plant can do in theory. What matters is whether the die that will run your part has a shot history, a maintenance interval and a repair record that match the life you were quoted.
Ask for the shot counter on the specific die, not the fleet average. A die quoted at 100,000 shots that already carries 70,000 has 30,000 left, which changes the tooling amortization in year two. Then ask what the maintenance interval is and who signs it off. A plant that services dies on a 10,000-20,000 shot cycle and welds heat checks before they propagate is managing die life, which is the standard NADCA guidance on die maintenance describes. A plant that waits for a crack is managing a schedule.

Die storage is the cheapest tell. Molds standing on a concrete floor with no tag, no rust protection and no protective plate on the parting line will lose their shut height and their water fittings within a season. Numbered racks with tags, cavity protection and a position log are a five-minute observation that predicts a great deal about what happens to your tool after the program ends. The same evidence base is what 压铸 mold maintenance records should contain, and an auditor can compare a plant against that list line by line.
Also check the welding station. A plant that repairs its own dies keeps electrodes, insert blanks and a preheat oven near the press. One that sends every repair out has a lead-time problem disguised as a maintenance policy.
Questions that produce a number instead of a story
“How many shots on this die, and when was it last serviced?” is answerable in a minute. “How is your quality?” is not. Use closed questions with a countable answer: shots since last service, water flow rate per circuit, die temperature set points per zone, average changeover time, last three scrap rates by defect code. Answers that arrive without a lookup are either memorized or invented, and both are informative.
Quality System Evidence: Chemistry, X-ray and Traceability
Quality is the dimension where paperwork is most easily faked and most easily verified, because the verification is arithmetic rather than judgement. Three checks cover most of the risk in any 压铸 factory audit, and all three can be completed inside an hour at the inspection room.
The first is chemistry. Ask for the spectrometer printout for the last five heats of the alloy you will run, and compare the silicon and copper values against the grade window. For ADC12, a plant holding 10.5-11.5% Si and 2.0-3.0% Cu is controlling the alloy. A plant quoting values outside the published range is either reading a different grade or not reading at all. The windows themselves are published in ASM International reference tables and in the ASTM composition limits, so the comparison is mechanical rather than a matter of trust. Retained printouts with heat numbers that match shipping records are the artifact, and they underpin any OES verification at the furnace.

The second is internal soundness. X-ray capability is not the same as X-ray practice. Ask for the film or image log for the last month, the sampling rate per cavity, and the acceptance level written on the drawing. Judgement to ASTM E505 level 2 for a sealed housing is a statement that can be checked against the films; “we check porosity” cannot. The third is metrology: calibration certificates that are current, gauge R&R under 10% on critical characteristics, and CMM programs built from the drawing datum scheme rather than from the die.
| Evidence item | What to ask for | Sample size that proves it | Fail signal |
|---|---|---|---|
| 化学 | Spectro printout per heat, retained | Last 5 heats of your grade | Only mill certificates from the ingot supplier |
| 内在稳健性 | X-ray log with sampling rate per cavity | One month of records | No sampling rule, films not retained |
| Dimensional | First article and dimensional reports | 2-3 similar parts | Reports without datum references |
| 泄漏测试 | Pressure, stabilization time, decay limit | Last 3 lots of a sealed part | Pass/fail only, no recorded curve |
| Calibration | Certificates and gauge R&R | All gauges on the audit line | Expired stickers, R&R above 30% |
| 可追溯性 | Heat lot to shipped lot | One live drill during the visit | Retrieval takes more than a day |
Traceability deserves the live drill. Pick a carton from the warehouse and ask the team to work backwards to the heat, the machine, the shift and the inspector. Under ten minutes is a working system. An hour is a filing problem. A day means the record exists only in principle, and a recall would be reconstructed from memory. The certification itself is a starting point rather than a result: ISO 9001 confirms a management system exists, and the audit confirms it produces records.
How HKX Prepares for a Customer Audit
At HKX, a 压铸 factory audit is treated as a retrieval test rather than a presentation, because the Ningbo plant expects the visitor to pick a carton and walk backwards. Chemistry sits on a direct-reading spectrometer, and every heat is sampled before the melt is released, with ADC12 held inside 10.5-11.5% Si and 2.0-3.0% Cu and the printout filed against the heat number. Die records carry a shot counter, a service interval of 10,000-20,000 shots, water circuit flow checks and weld repair history, and every mold lives on a numbered rack with a parting line protector. Die temperature runs in four to six zones, vacuum valves close on the shot curve at 85-92% fill, and spray cycles are timed per zone, so the parameter sheet on the machine matches the one in the audit file. Inspection is documented as a deliverable: X-ray of the first ten shots at 100%, then one part per hour per cavity to ASTM E505 level 2, CMM programs built from drawing datums, and a leak test with a recorded decay curve. Lot traceability runs from heat to carton in one query, which is the answer HKX prefers to give in person.
The same records form the audit pack, so a visit starts with the file already open rather than with a search, and the manufacturing process overview lists what the walk covers. Nothing in the pack is created for the visit. Each document exists because the process needed it that week, which is the difference between a system and a presentation.
From Score to Decision
A 压铸 factory audit produces a number, and a number only helps if the decision rules were written before the visit. Use four bands, and treat the per-dimension floor as binding.
| Total score | Decision | Condition before production |
|---|---|---|
| 85-100 | Approved for production | Standard PPAP level 3, sample run at the audited cell |
| 70-84 | Approved with actions | Written corrective actions on any dimension below 4, verified within 30 days |
| 55-69 | Conditional, sample only | T1 sample with full dimensional report; re-audit before serial release |
| Below 55, or any dimension at 2 | Not approved | Re-audit after documented system change, not after a promise |
The per-dimension floor is what separates a score from a negotiation. A plant that scores 88 with a tooling dimension of 2 is not an approved supplier. It is a plant with good machines and no die discipline, and the failure will arrive in year two, after the tooling is paid for. Write the floor into the audit form and into the purchase agreement, so the condition survives the personnel change on both sides.
Re-audit on a schedule tied to risk rather than to calendar habit. A new supplier, a new cell or a new alloy deserves a full audit. A running program needs a two-day desk review per year plus one floor day, and the score should move less than five points if the system is real. A jump of twenty points in a year usually means the first audit was generous, which is a finding about the auditor as much as the plant.
经常问的问题
How long should a die casting factory audit take?
One full day for a single program covering machines, tooling, metrology and documentation. Two days if the plant runs multiple alloys or if heat treatment and finishing are in scope. Half a day is enough only for a desk review of an existing supplier.
What is the most important dimension in the scoring matrix?
Tooling and die maintenance carries 15 points and the highest pass line, because it is the dimension that fails after the first article passes. Machines can be rented with capacity; die discipline cannot be improvised once your tool is in the rack.
Do I need a CMM at the plant to approve it?
Not necessarily, if the supplier uses a certified third-party laboratory with a documented measurement system. What cannot be outsourced is the datum scheme: reports must reference the drawing datums, whichever instrument produces the numbers.
How do I verify traceability during a visit?
Pick a finished carton at random and ask the team to identify the heat, the machine, the shift, the inspector and the X-ray record. Under ten minutes is a working system. Anything over an hour means the record is theoretical.
Should the audit score be shared with the supplier?
Yes, with the evidence attached. A shared score turns the visit into a corrective action plan, and a supplier that disputes a finding with a document is telling you the system works. Withholding the score produces a second visit with the same findings.
How often should a running supplier be re-audited?
Annually for a stable program, sooner after a quality spill, a die transfer or a change of plant management. Keep the same score sheet, so the trend is comparable and a twenty-point jump is visible as an anomaly rather than progress.
作者:HKX 工程团队
HKX — 宁波合信模具有限公司,一家铝压铸件 中国宁波的制造商,拥有 30 多年的工具 经验,内部加工和精加工,ISO 9001和IATF 16949认证,以及20多个国家的客户。
与 HKX 工程团队交谈
Bring the score sheet to the Ningbo plant, or ask HKX to complete it before you travel. A 压铸 factory audit works best when the supplier has already assembled the evidence: spectro records per heat, die shot counts and service logs, CMM programs built from drawing datums, X-ray films judged to ASTM E505 and a live traceability drill from carton to heat. HKX provides that package with the visit, plus a first article report for parts in the industrial equipment enclosure range or an automotive program. To schedule a review, contact our engineering team and name the dimensions you intend to grade.